p1010675

What a difference a day makes!  So much happened yesterday, Eastern Millwork was here all day with a full crew.  SolidTops marble finishers were also here installing the backsplashes inside the cabinets and the top for the register area.  

p1010680

The shelf that surrounds the landing is in place and connects exactly with the cabinets:

p1010688

The shelves for underneath the stairs were installed, fitting perfectly into that cubby:

p10106821

On this set of cabinets the doors were being fixed to make room for one more run of shelves:

p1010676

A tough spot in that cabinet was being worked out:

p10106781

This was added:

p1010674

We needed to add railings in the stairwell that were at the correct height, the fire marshall insists on this:

p1010686

p10106871

Upstairs, the eat at counter framework was set in place.  I think that SolidTops is due back today (well, I hope) to install the marble that rests on the supports:

p1010684

You can see there is a channel for the marble to fit into but it shouldn’t go all the way to the left wall, that needs to be filled in by drywall.  Also, I left a gap between the left wall and the end of the counter top to prevent spills form hitting the wall directly but that decision was based on the assumption that there was a wooden backsplash all the way around the countertop…I need to work this out.

There is work left to do!

dec4-08_big1In preparation for our electric and HVAC inspections this afternoon, we cleaned the store to make it look more complete.  It turned out to be a great idea, the store looks much better overall and areas that aren’t finished are more obvious.  For example, the cabinets on both walls are missing their top panels:

dec4-08_7

Luckily, the cabinets don’t have anything to do with electrical wiring or HVAC installation so we passed those inspections without any trouble.  [thanks to Ryan from DC Electric for posing in these pictures and wiring Piazza]