What a difference a day makes!  So much happened yesterday, Eastern Millwork was here all day with a full crew.  SolidTops marble finishers were also here installing the backsplashes inside the cabinets and the top for the register area.  


The shelf that surrounds the landing is in place and connects exactly with the cabinets:


The shelves for underneath the stairs were installed, fitting perfectly into that cubby:


On this set of cabinets the doors were being fixed to make room for one more run of shelves:


A tough spot in that cabinet was being worked out:


This was added:


We needed to add railings in the stairwell that were at the correct height, the fire marshall insists on this:



Upstairs, the eat at counter framework was set in place.  I think that SolidTops is due back today (well, I hope) to install the marble that rests on the supports:


You can see there is a channel for the marble to fit into but it shouldn’t go all the way to the left wall, that needs to be filled in by drywall.  Also, I left a gap between the left wall and the end of the counter top to prevent spills form hitting the wall directly but that decision was based on the assumption that there was a wooden backsplash all the way around the countertop…I need to work this out.

There is work left to do!